Water Infrastructure Investment & Operation

Biwater plc

Category:

Laguna Alta is a turnkey BOOTLaguna Alta is a turnkey BOOT (Build, Own, Operate and Transfer) project involving the construction of a 76 MLD potable water treatment plant for Aguas de Panama and included water sampling and analysis, process design, hydraulic design, civil and M&E design and procurement of all materials, construction and setting into operation of the plant.


potable water treatment plantBiwater has complete responsibility for ensuring that the guaranteed volumes of potable water are available to the served population of approximately 370,000 people, to the correct quality, at all times for the next 30 years.


ductile iron pipework.


Key Features:

  • Consistently meets and supplies water to WHO standards.
  • Exceeded both flow and quality expectations.
  • 30 year operation and maintenance period.
  • 25km of ductile iron pipework.
  • Supply to 370,000 population.

Lake Gatun, Panama

Location: Lake Gatun, Panama

Lake Gatun, Panama

Client: IDAAN