Water Treatment

Biwater plc

Category: Water Treatment

The Sungai Selangor projectThe Sungai Selangor project comprises two stages: Stage 1 - works necessary to produce 400 Mld of potable water; Stage 2 - the implementation of remaining works to provide 800 Mld of potable water. The peak flow of the plant is 960 Mld.

river intake and treatment works

Biwater has undertaken the design, supply and erection of all the electro-mechanical equipment for the river intake and treatment works plus the civil engineering construction of the process units for the treatment plant.

Sungai Selangor Water Supply SchemePhases 1 and 2 of the Sungai Selangor Water Supply Scheme augment the water supply for the Klang Valley and its environs.

Location: Bukit Badong, State of Selangor, Malaysia

nanofiltration and microfiltrationClient: Gamuda-KDEB Joint Venture

Desalination -Reverse Osmosis

Biwater specialises in reverse osmosis (RO) desalination and other membrane separation systems such as nanofiltration and microfiltration. Our project references vary from one of the world's largest RO plants in Saudi Arabia at 59,000 cubic metres per day, through to desalination systems for remote island communities such as the Seychelles and compact RO packages for oil rigs and ships.

membrane separation systems

Location: WorldwideDesalination -Reverse Osmosis

Client: Public and Private Sector Clients